#TDA26 Judging panel unveiled: Meet our 32 judges
Secure your #TDS26 pass at the best rate - Register before THIS Friday, 18th Sept
Our registrations include: Meyer Sound, Navori Labs, Powersoft, WSP, Gleeds, Christian Constantin SA, MARI Group, QA Venue Solutions, WilsonSEA, WOO Architects, THE TEAM, NEWSUBSTANCE, FC Sion, F3 Architects, Stace LLP, Bath Rugby Club, HH Sportsbase + Venues and many more...

Articles

Project Preview: $178 million makeover for Phoenix International Raceway

TheStadiumBusiness Design & Development Summit has become the world’s largest gathering of project delegations involved in the design, construction, refurbishment and management of major sports venues.

With more than €10.5bn worth of construction already confirmed in attendance on 28-29 Nov in Barcelona, we present insight into some of the projects showcasing at the meeting.

Executive Vice President of Design & Development for International Speedway Corp, Derek Muldowney, will join the 2017 speaker line up to update on Phoenix Raceway’s $178 million makeover, after construction began a few months ago.

Back in May, Racer reported that the first piece of steel installed – as part of a special ceremony for the project – featured a special message “Best Wishes from Daytona,” signifying a symbolic passing of the torch from Phoenix Raceway’s partner facility Daytona International Speedway, which also recently completed a significant redevelopment project – DAYTONA Rising.

azcentral reported on the features of the makeover to enhance the fan experience at the Avondale racetrack. Most notably:

  • The start and finish line will be moved to what is now Turns 1 and 2 and will be right in front of new grandstands.
  • The new infield promises an up-close experience to the racers, their cars and teams. It will feature a Fan Zone equipped with five new garages and opportunities for up-close watching of the drivers as they work on their cars prior to the race.
  • Fans will be able to watch drivers enter the pre-race drivers’ meeting at “The Pits,” dubbed by PIR as “amazing garage access sites.” Fans can watch the meeting through a glass wall.
  • Current seating at the Bobby Allison Grandstand, located between Turns 1 and 2, is entirely benches. That will be replaced with individual 20-inch seats with armrests. Plus, a grandstand extension to the east will have a combination of 20- and 21-inch seats with armrests.
  • Grandstand seating capacity will be 45,000, down from the current 50,000.
  • The number of elevators at the new grandstands will be doubled to 10, in addition to new souvenir areas, bathrooms and restrooms.
  • The facility’s 32 suites will be upgraded, and 19 more added.
  • The old grandstands will be demolished. For decades, fans in this section got a generous share of sun and glare, especially at sunset.
  • The new grandstands will face northeast, and the sun will set behind race watchers’ backs.

More details can be found on azcentral’s website here.

At TheStadiumBusiness Design & Development Summit, Derek will update an audience of senior figures on the project on 28-29 November, Barcelona. Registrations is open to join the Summit here.

Meet Derek (alongside 50+ stadium projects) at the Summit, 28-29 Nov, Barcelona. Register your place here.

Posted in Articles | Featured